Solar Atmosphere Receives Boeing Approval for Vacuum Oil Quenching
The approval was granted for oil quenching of alloy steels in the company’s new furnace, the Neo.
Share
DMG MORI - Cincinnati
Featured Content
View MoreAutodesk, Inc.
Featured Content
View MoreSolar Atmospheres Inc. announces the approval of a critical Boeing specification for the oil quenching of alloy steels in accordance with Boeing’s specification BAC 5617.
Michael Johnson, sales director states, “We are honored to earn this accreditation from Boeing. The approval for our new vacuum oil quench furnace, the Neo, represents a massive addition to Solar’s heat treat capabilities. The Neo’s vacuum chamber is designed to thermally heat parts with the use of work thermocouples, transferring into a vacuum protected vestibule within 20 seconds, and finally immersing a maximum 2,000-pound load into a hot agitated 3,000-gallon oil quench bath. All of this processing is done without a single flame or a puff of smoke. Additionally, the inert processing and fast reliable transfer times provide our customers with superior metallurgical properties. Maximum through hardness is achieved and the surface contamination of flight critical components is totally eliminated. From landing gear to additive-manufactured components, the Neo is unlocking an entirely new world of bright, clean, safe and environmentally friendly oil quench processing for us. Now Solar can support additional Boeing programs, including their extensive domestic supply base.”
Related Content
-
Machine Monitoring Boosts Aerospace Manufacturer's Utilization
Once it had a bird’s eye view of various data points across its shops, this aerospace manufacturer raised its utilization by 27% in nine months.
-
Rego-Fix Appoints New Global Aerospace Specialist
Sherman D’Souza will provide global customers with access to Rego-Fix research, development and technical support teams to create and supply toolholding solutions.
-
How a Custom ERP System Drives Automation in Large-Format Machining
Part of Major Tool’s 52,000 square-foot building expansion includes the installation of this new Waldrich Coburg Taurus 30 vertical machining center.