In last month's column, I discussed how supermarkets can help companies maintain flexibility by regulating the work flow of critical processes. Supermarkets do a great job of aligning demand and production capacity, which is key to a lean flow.
In last month's column, I discussed how supermarkets can help companies maintain flexibility by regulating the work flow of critical processes. Supermarkets do a great job of aligning demand and production capacity, which is key to a lean flow. However, some job shops specializing in custom fabricated products may have a hard time implementing supermarkets in their environment. Fear not: There is another technique that can be just as effective in regulating work flow in a job shop. This technique is known as a FIFO lane.
You are probably already familiar with the term FIFO or "First In, First Out." The term is used in accounting as a method of calculating the cost of inventory and in warehousing as a means of rotating stock and managing inventory.
FIFO lanes employ the same first in, first out concept to regulate and manage the job flow in a manufacturing operation. Much like a supermarket, in which items are stocked and replenished when inventory reaches a predetermined level, FIFO lanes are established and sized to hold a limited number of jobs.
In our example (see chart below), the FIFO lane consists of four positions. Painted or taped lines on a floor, markings on a roller conveyor or clearly marked space on a shelf can serve to make the FIFO lane visual. In practice, the first job coming from Process A is moved into the first open position in the FIFO lane. Position 1 indicates an empty lane. The next job coming from Process A would be placed in the next open position. The FIFO lane is loaded with the output of Process A until all four positions are filled. Once this occurs, work flow is regulated because no other job can be placed in the FIFO lane until the job in Position 1 is moved to Process B. When a job is moved to the next process, this opens up a space to accept another job from the supplying process.
The FIFO lane limits the amount of work-in-process inventory that can build up by limiting the physical space that inventory can consume. The smaller the FIFO lane, the tighter the control. As the chart shows, there will never be more than four jobs built up waiting for Process B. At the same time, by physically limiting the size of the positions within the FIFO lane, you are regulating not only the number of jobs, but also the quantity of parts that can be contained. For example, if a large job is scheduled for Process A, and the job requires multiple pallets or skids, then the job will consume multiple positions in the FIFO lane.
The regulating feature of the FIFO lane affects the decision of whether or not to start a job in the supplying process. If all boxes in the FIFO lane are filled with jobs, it makes no sense to start a job in Process A. This might be a good time to assign Process A's operator to some other task, rather than risk starting and finishing a job and having no place to put it.
In the FIFO lane example shown, one process feeds another. However, the concept will work just as well in any of the following situations:
1) one process feeds multiple processes; 2) multiple processes feed one process; or 3) multiple processes feed multiple processes. In each of these situations, the regulating feature of the FIFO lane controls the amount of work-in-process inventory that can be generated.
FIFO lanes can be configured in many ways. A single lane is the simplest, but if there are multiple processes involved, there may be a benefit to having multiple lanes lying in parallel.
The size of the FIFO lane is based on a number of factors, including the capacity of both supplying and secondary processes, the rate of customer demand and any system constraints (such as long change-over time or downtime issues) that have not yet been resolved.
Try using a FIFO lane in your job shop. It is easy to implement and will provide an effective means of managing your work flow.
Related Content
Solve Worker Shortages With ACE Workforce Development
The America’s Cutting Edge (ACE) program is addressing the current shortage in trained and available workers by offering no-cost online and in-person training opportunities in CNC machining and metrology.
Read MoreThe Power of Practical Demonstrations and Projects
Practical work has served Bridgerland Technical College both in preparing its current students for manufacturing jobs and in appealing to new generations of potential machinists.
Read MoreManufacturing Madness: Colleges Vie for Machining Title (Includes Video)
The first annual SEC Machining Competition highlighted students studying for careers in machining, as well as the need to rebuild a domestic manufacturing workforce.
Read MoreHow I Made It: Amy Skrzypczak, CNC Machinist, Westminster Tool
At just 28 years old, Amy Skrzypczak is already logging her ninth year as a CNC machinist. While during high school Skrzypczak may not have guessed that she’d soon be running an electrical discharge machining (EDM) department, after attending her local community college she found a home among the “misfits” at Westminster Tool. Today, she oversees the company’s wire EDM operations and feels grateful to have avoided more well-worn career paths.
Read MoreRead Next
5 Rules of Thumb for Buying CNC Machine Tools
Use these tips to carefully plan your machine tool purchases and to avoid regretting your decision later.
Read MoreThe Future of High Feed Milling in Modern Manufacturing
Achieve higher metal removal rates and enhanced predictability with ISCAR’s advanced high-feed milling tools — optimized for today’s competitive global market.
Read MoreRego-Fix’s Center for Machining Excellence Promotes Collaboration
The new space includes a showroom, office spaces and an auditorium that will enhance its work with its technical partners.
Read More