What Is Directed Energy Deposition?
Analyzing directed energy deposition and powder-bed fusion provides a thorough understanding of the extra machining necessary for a “near net shape” versus a “net shape” manufacturing process.
Share
Last month, I discussed the challenges of making large parts with additive manufacturing (AM), specifically, scaling powder-bed fusion (PBF) processes for large parts because of the inherent cost and build time limitations.
Directed energy deposition (DED) is similar to PBF because it uses a laser (or electron) beam to melt powder. However, the way in which powder feedstock is deposited and melted enables DED to scale more easily and cost-effectively to larger AM parts.
According to the ASTM/ISO standard for AM terminology (ISO/ASTM 52900-15), “DED is an additive manufacturing process in which focused thermal energy is used to fuse materials as they are being deposited.” While lasers may be the most popular “focused thermal energy” source for DED, electron beam and plasma arc DED systems are readily available from companies like Sciaky and Norsk Titanium, respectively. For the rest of this column, however, I am going to focus primarily on laser and powder-feed systems. Next month, I will talk about the advantages and disadvantages of the other types of DED systems.
In laser-based, powder-fed DED, the material being fused is deposited by “blowing” metallic powder through small nozzles or orifices into a melt pool created by the laser. Depending on the power and type of laser being used, the laser beam is focused to create a known spot size (for example, 0.5 or 1 mm for a 500-watt laser versus 1.5 or 3 mm for a 2.5-kilowatt laser). The depth and velocity of the resulting melt pool are dictated by the scan speed of the laser (or movement of the part on the build platform underneath the laser) and the energy absorption and thermal conductivity of the feedstock that is being deposited.
The size of the melt pool, the speed at which the laser moves and the powder feed rate (the rate at which powder is blown through the nozzles toward the laser) dictate how much powder is captured in the melt pool and ultimately how much material is fused to the part—the layer beneath as well as adjacent material within the layer currently being built. A large, hot, slow-moving melt pool will have a higher powder capture rate (70- to 80-percent, which is the best case) than a smaller or faster moving melt pool (20- to 30-percent capture rate, which is the worst case). However, the thermal history and therefore the microstructure and mechanical properties of the AM part will be different in the two cases. This is one of the challenges with DED, namely, tuning your process parameters to ensure a fast build time, efficient use of powder and a part that is dimensionally accurate.
Once optimized, build rates for DED tend to be a little faster than PBF. The laser spot size for DED is at least 10X or larger compared to what is used in PBF. This creates a larger melt pool target for the powder to hit, melt and fuse together. Can you imagine what powder-capture rates would be if you were trying to hit a 50- to 75-micron diameter melt pool in a PBF system?
Also, larger powder particles tend to be used in DED systems (50- to 150-microns in diameter in DED versus 20- to 50-microns for PBF), as they tend to flow better and provide more surface area to speed the melting process. Larger powder particles also enable thicker layers compared to PBF, which means fewer layers to build when using DED.
Consider the nozzle shown in the figure. This nozzle only takes about 20 minutes to build on our 500-watt laser-based, powder feed DED system in Ti-6Al-4V. Building the same part on our 400-watt laser-based PBF system also takes about 20 minutes of laser scan time, but the total build time for the part on a PBF system is nearly four hours when you factor in recoating.
Why the large difference? With DED, you only deposit material where you need it. The laser simply moves three to four times around the circumference of the nozzle to build a layer and the next layer starts immediately after the laser is repositioned. With PBF, however, the next layer can only begin after a new layer of powder has been spread. So, if the part is built using 30-micron layers, then the 45-mm-tall nozzle has 1,500 layers. Multiply the number of layers by the time it takes to recoat a single layer (about 9 seconds for Ti-6Al-4V), and the recoating time is 3.67 hours. Granted, current laser PBF systems build Ti-6Al-4V parts using 60-micron layers (or 90 microns in some systems), but that still means the build time for the nozzle on a PBF system is nearly two hours (or 1.5 hours at 90-micron layers).
While the DED nozzle builds faster, you can see in the figure that the surface finish on the part is pretty rough (comparable to what is achieved when sand casting). You can see many of the actual layers, and the dimensional accuracy of the part is much less than what is possible on a PBF system. As a result, more machining will be likely needed to finish a DED part and meet specifications. Because of this, many consider DED more of a “near net shape” process versus a “net shape” manufacturing process like PBF, but as I said last month, that is good news for you machining professionals out there as AM with DED means more business for you.
This is part one in a series about directed energy deposition.
Related Content
How to Meet Aerospace’s Material Challenges and More at IMTS
Succeeding in aerospace manufacturing requires high-performing processes paired with high-performance machine tools. IMTS can help you find both.
Read MoreThe Benefits of Vertically Integrating Metal 3D Printing and Machining
Having 3D printing and machining within one organization enables Addman’s engineers to collaborate and consolidate so it can quickly make successful metal 3D printed parts.
Read MoreIn Moldmaking, Mantle Process Addresses Lead Time and Talent Pool
A new process delivered through what looks like a standard machining center promises to streamline machining of injection mold cores and cavities and even answer the declining availability of toolmakers.
Read MoreChuck Jaws Achieve 77% Weight Reduction Through 3D Printing
Alpha Precision Group (APG) has developed an innovative workholding design for faster spindle speeds through sinter-based additive manufacturing.
Read MoreRead Next
IMTS 2024: Trends & Takeaways From the Modern Machine Shop Editorial Team
The Modern Machine Shop editorial team highlights their takeaways from IMTS 2024 in a video recap.
Read MoreThe Future of High Feed Milling in Modern Manufacturing
Achieve higher metal removal rates and enhanced predictability with ISCAR’s advanced high-feed milling tools — optimized for today’s competitive global market.
Read MoreInside Machineosaurus: Unique Job Shop with Dinosaur-Named CNC Machines, Four-Day Workweek & High-Precision Machining
Take a tour of Machineosaurus, a Massachusetts machine shop where every CNC machine is named after a dinosaur!
Read More