Published

Shop Starts Work on Custom Drill for Ventilators Before Purchase Order Came

When this Indiana toolmaker saw an order for cutting tools to make ventilators for coronavirus patients, his workers started grinding before the customer officially hired them.

Share

It’s not every day that the shopfloor workers decide to run a job before the owner has gotten the purchase order, but the coronavirus pandemic makes for interesting times. “My guys had started putting the job together before I finished filling out the quote,” says Mark Delaney, operations manager at Nicholas Precision Works (NPW), an Indiana toolmaking shop. “I just said, ‘Okay, I guess we’re making the parts whether we get paid or not.’”

Mr. Delaney has been a toolmaker since 1984, working for numerous companies for years before coming to NPW. In the past, he’s made cutting tools or stealth bombers and nuclear submarines. An old hat in the toolmaking world, Mr. Delaney feels his experience complements the programming skills of his younger employees. “We butt heads a lot,” he says. “Sometimes they’re right, and sometimes they’re just making more work for themselves.” The give-and-take between the different approaches helps the shop perform at its best, he says. However, in early April, he let his younger workers take the lead for a job.

Step Drill Nicholas Precision Works

Nicholas Precision Works received an RFQ for this step drill, which was intended for manufacturing parts for ventilators intended for COVID-19 patients. Energized by the chance to help in the midst of a pandemic, the shopfloor workers got to work on the cutting tools before they had officially been hired, finishing the job hours after the purchase order came in.

When Mr. Delaney received a request for quote (RFQ) for step drills, he learned they were for manufacturing ventilators for COVID-19 patients. “When we saw the RFQ, the young guys on the floor got really excited,” Mr. Delaney says. “Everyone wants to do their part, and this was the perfect opportunity for them.” Programmer Ryan Alderfer asked to start work on the step drills immediately. “Who was I to say no after all the stupid stuff I’ve done?” Mr Delaney asks.

By the time the purchase order came in the next morning, Mr. Alderfer had programmed three machines, with two of them already running. All three machines were running in less than an hour, at a tighter tolerance than the job had called for. When the distributor — S&S Industrial Supply out of Potage, Michigan —  phoned to see if the shop could rush the order, Mr. Delaney let him know the step drills were already packed for shipping. “Ryan really took charge on this,” Mr. Delaney says. “I’m really proud of him.”

With schools closed, several of NPW’s employees had their children on site, learning remotely in a conference room. “I got to tell the kids that their parents were making tools that would help save lives,” Mr. Delaney says. “Really, we were just doing a toolmaker’s job, but it felt good to know we could help.”

Related Content

Related Content

Sponsored

The Future of High Feed Milling in Modern Manufacturing

Achieve higher metal removal rates and enhanced predictability with ISCAR’s advanced high-feed milling tools — optimized for today’s competitive global market.

Read More
Holemaking

Mikron Tool's Drill Provides High Performance in Titanium

The new CrazyDrill Cool Titanium series is designed to provide controlled chip removal, high drilling speeds and long tool life.

Read More
Holemaking

Allied Machine Drill System Provides Enhanced Chip Evacuation

Eastec 2023: The T-A Pro drill body incorporates straight flutes designed for optimized coolant flow and rigidity.

Read More
Holemaking

Darex Adds End Mill Attachment to Drill Sharpener

This LEX600 end mill attachment enables users to sharpen the primary and secondary grind on the tips of two-, three- or four-fluted end mills up to 5/8".

Read More

Read Next

Medical

Aerospace Supplier Shifts to Tight-Tolerance Ventilator Parts: "We Weren't in This Business Two Weeks Ago"

Skilled Manufacturing Inc. is running seven days a week to produce ventilator parts that will help healthcare workers battle the coronavirus.

Read More
Die/Mold

Die Maker Describes Five-Day Build for Tool Urgently Needed for Coronavirus Ventilator Production

Running 11 five-axis machines simultaneously, a die maker reduced a five week lead time to just five days. Here’s how. 

Read More
Die/Mold

One Auto Parts Supplier's Shift to Ventilators: Now Making 1000s of Parts per Week on Die Delivered in Days

GM applying its supply chain expertise to enable successes such as aiding this ventilator maker to expand sourcing for 700 parts.

Read More